Kitchen and utility plumbing
Plugging in a new washing machine is easy when a supply valve and waste are already in the right place. It becomes a plumbing job when the appliance is going somewhere new, the old connections leak, or a dishwasher is being added to a kitchen that never had one. Washing machine installation of this kind means getting water in, waste water away and the appliance level and secure. We check the space, explain the work and provide a fixed written quote before starting.
Monday to Friday, 8am to 6pm. Quotes are free and without obligation, and we aim to reply within 24 hours.
A washing machine needs a cold supply with its own appliance valve, a waste connection that can take a fast flow of water, and enough space behind the machine for the hoses without kinking them. The waste usually goes into a standpipe with a trap or a spigot on the sink trap. Either way it must sit high enough to stop dirty water siphoning back into the drum.
Where the machine is moving to a utility room, a cloakroom or the other side of the kitchen, new pipework is run from the nearest suitable supply and waste. Routing it neatly behind units or along a wall, and keeping falls on the waste correct, is most of the work.
A dishwasher follows the same principle but is normally fed from the cold supply and drained into the sink waste through a dedicated spigot or a separate trap. An integrated dishwasher also has to be fixed to the worktop or the side panels and fitted with its door panel, so the space must match the appliance dimensions.
Adding a dishwasher to an existing kitchen often means removing a base unit. We can do the plumbing and fitting of the appliance itself; if cabinets need altering beyond removing a unit, it is worth discussing that at the quote stage.
Water on the floor after a wash, a smell of drains from behind the machine or a drum that will not empty properly all point to the connections rather than the appliance. Old rubber hoses perish, valves that have not been turned for years may not close, and a waste pipe that is too low can let water siphon away mid-cycle.
A slow-draining sink that gurgles when the machine empties suggests the shared waste is partly blocked. Our leak and drain repairs page covers what happens when the problem sits further down the pipework.
Before buying, measure the gap including the depth needed for hoses and the power socket. A socket directly behind a machine makes it difficult to unplug safely, and the supply valve should be reachable without dragging the appliance out. Machines also need a firm, level floor; a washing machine on a springy timber floor will walk during a spin.
Stacking a dryer on a washing machine needs the correct stacking kit for the two models. A condenser or heat pump dryer may also need a drain connection, which can usually share the same waste arrangement.
The cost depends mainly on how far the supply and waste have to travel and what is in the way. Swapping an appliance onto existing, sound connections is a short job. Running new pipework through a wall into a utility room, or lifting flooring to reach a waste, takes more time and making good.
Send photographs of the space, the existing valves and the pipework under the sink. If you are also changing a kitchen tap, see our tap repair and replacement page, as the two jobs often share the same visit.
We work across our Gloucestershire and Herefordshire area, Monday to Friday, 8am to 6pm. Include your postcode and a few photographs when you enquire so we can see the job before we visit.
Related: Plumbing services, Tap repair and replacement, Leak and drain repairs.
Usually, if a suitable supply and waste can be reached. The route for new pipework and the fall on the waste decide how practical it is.
Yes, in most kitchens. It connects through a spigot on the sink trap or a separate trap, with the hose looped high to prevent back-siphoning.
That normally points to the waste connection or a perished hose rather than the supply valve, which would leak all the time.
Connecting to existing valves and waste is quick. New pipework into another room takes longer, depending on the route.
Calls answered 8am-6pm Mon-Fri · missed calls returned the same day.
"A master of his class, gone above & beyond to deliver exactly what I wanted, to an extremely high spec.", Jamie, verified review