Bathroom tiling contractor for walls and floors

Expert bathroom wall and floor tiling with proper waterproofing, precise cuts, and professional grouting for a flawless, lasting finish. Available across Gloucester, Cheltenham, Tewkesbury, Stroud, Malvern, Ledbury, Newent and Ross-on-Wye.

Get Free Quote Call 07927 593585

What our bathroom tiling service covers

Expert bathroom wall and floor tiling with proper waterproofing, precise cuts, and professional grouting for a flawless, lasting finish.

Waterproof membrane applied behind all shower and bath area tiles
Precision diamond-cut edges around pipes, corners, and outlets
Flexible adhesive and grout specified for wet areas
Level floors and flat walls prepared before a single tile is laid
Clean, consistent grout lines with professional finish

Bathroom Tiling by Location

Choose your area for local information, pricing context and a free quote.

Towns & Cities

How our bathroom tiling works

  1. 1

    Surface Preparation

    Remove old tiles, repair plaster, check for damp, apply waterproof membrane to wet areas.

  2. 2

    Setting Out

    Plan the tile layout for symmetry, ensuring cuts are balanced and positioned in the least visible places.

  3. 3

    Tiling

    Tiles laid with consistent spacers, level checks, and precision cuts using a wet tile cutter.

  4. 4

    Grouting & Sealing

    Waterproof grout applied, excess cleaned, silicone sealed at all junctions between different materials.

Bathroom Tiling costs by area

Typical bathroom tiling pricing in our region sits around £1,850, with a realistic spread of £900-£3,800 depending on spec and access. Pick your area for a written, itemised cost breakdown.

Bathroom Tiling FAQs

Can you tile over existing tiles?

Sometimes, if the existing tiles are sound, flat, and firmly adhered. But in wet areas of Gloucestershire bathrooms, we usually recommend removing them to check for damp and apply proper waterproofing.

How do you handle large-format tiles?

Large tiles need a perfectly flat substrate, any undulation and they'll rock. We use self-levelling compound on floors and render or backer board on walls. Precision cuts with a wet cutter, not angle grinder.

What preparation do tiled floors need?

A tiled bathroom floor needs a stable, level substrate before any adhesive goes down. In Gloucestershire homes we check for movement, damp and out-of-level boards first so the finished tile does not crack.

Get a free quote

Tell us about your project and we'll come back within 24 hours with honest advice and a clear, written quote.

Tiling done by the team that plumbs the room

If you are looking for a tiling contractor for a bathroom, the preparation under the tiles matters as much as the tiles themselves. We check that walls are sound and floors are stiff, waterproof shower areas before tiling, and set out the layout so cuts fall in sensible places rather than at eye level.

Because we also do the plumbing, pipework, valves and wastes are positioned before tiling starts and nothing has to be cut back in afterwards. That is why many customers ask for plumbing and tiling together, whether it is a full bathroom, a shower area or regrouting and resealing an existing room.

Bathroom tiling is available in Gloucester, Cheltenham, Tewkesbury, Stroud, Malvern, Ledbury, Newent and Ross-on-Wye, Monday to Friday, 8am to 6pm, with free, no-obligation quotes.