Fitting and design

The right order for a bathroom refit

The short answer

Bathroom projects run late when trades arrive in the wrong order. The sequence is fixed by what has to be buried before something else covers it.

Where jobs go wrong

Skipping ahead, tiling before first fix is tested, for instance, is what creates rework and finger-pointing.

Frequently asked

Can trades overlap?

Some can, but tanking and tiling need a clear run to cure and set out properly.

When should the suite be on site?

Before first fix, so the fitter can set services to the actual products rather than to a specification sheet.

Design decisions worth getting right

Point 1

Strip out, then structural and drainage work, then plumbing and electrical first fix, then boarding and tanking, then tiling, then second fix and sealing.

Point 2

Skipping ahead, tiling before first fix is tested, for instance, is what creates rework and finger-pointing.

Recent fully tiled bathroom refit completed in Stroud, relevant reference for Gloucestershire clients, referenced in our guide to sequence of trades
en-suite bathroom installation #2, Quedgeley, Cotswold Maintenance Group portfolio, referenced in our guide to sequence of trades

Talk through sequence of trades with the person doing the work

Send a short description of the room and what you want to change. We'll come back with practical options rather than a brochure.