Fitting and design
What a realistic bathroom fitting timeline looks like
The short answer
A full refit is a sequence of dependent stages with curing time between them. Compressing the programme usually means compromising a stage that matters.
The detail that matters
- 1
Tanking and adhesive both need curing time; forcing tiling forward is how hairline grout cracks appear later.
- 2
Delays typically come from product lead times and unforeseen structural or drainage findings once the room is stripped.
Connected pages on this site


Questions we get asked
Will I have a working toilet during the work?
Usually the WC is reinstated at the end of each stage where possible, but there will be periods without one.
What causes most overruns?
Late product deliveries and hidden defects found at strip-out.
Working out what is realistic in your space?
Room dimensions, the position of the window and where the waste leaves the building decide most of it. Send those and we can be specific.