Fitting and design

What a realistic bathroom fitting timeline looks like

The short answer

A full refit is a sequence of dependent stages with curing time between them. Compressing the programme usually means compromising a stage that matters.

The detail that matters

  1. 1

    Tanking and adhesive both need curing time; forcing tiling forward is how hairline grout cracks appear later.

  2. 2

    Delays typically come from product lead times and unforeseen structural or drainage findings once the room is stripped.

Recent fully tiled bathroom refit completed in Stroud, relevant reference for Gloucestershire clients, referenced in our guide to fitting timeline
en-suite bathroom installation #2, Quedgeley, Cotswold Maintenance Group portfolio, referenced in our guide to fitting timeline

Questions we get asked

Will I have a working toilet during the work?

Usually the WC is reinstated at the end of each stage where possible, but there will be periods without one.

What causes most overruns?

Late product deliveries and hidden defects found at strip-out.