Pre-1840 typically property · Gloucestershire
A full installation done properly for a listed building — strip-out, plumbing, electrics, tiling and finishing handled as one project. Listed buildings — Grade I, II*, and II — are the most heavily regulated property type, and bathroom fitting in them must be planned around consent, breathable materials, and the specific significance of the listing.
A complete bathroom installation in a listed building typically runs through these stages:
Old suite, tiles and substrate removed. Joists, pipework and walls inspected — important in Pre-1840 typically properties where what's behind the tiles isn't always what you'd expect.
Hot/cold supply re-routed where needed, soil and waste set, new electrical circuits run and certified under Part P. Underfloor heating laid if specified.
Tile-backer board on wet walls, plaster on dry. Floor levelled and reinforced where the joists need it — common in older properties.
Wall and floor tiling, suite fitted, second-fix electrics, sealants, decoration and snag-list — everything ready to use the day we hand back.
Specific quirks of listed building properties in Stroud.
Once the old bathroom is out, these are the issues we most often find in listed building homes around Stroud — and we cost them in honestly before re-fitting.
Previous unsympathetic refits (1970s/80s) requiring full reversal
Damp from inappropriate modern repointing trapping moisture
Concealed historic services that mustn't be disturbed without survey
Inadequate insulation balanced against breathability requirements
For a listed building installations specifically — most relevant to Gloucestershire properties.
Variable — often retrofitted into former dressing rooms, closets, or rear additions. Layouts must work around the historic plan, never against it.
~£7,800
Typical installed price in Stroud (£4,500–£14,000 range)
Listed building bathroom refits commonly run 25–50% above the regional typical due to consents, traditional materials, slower pace, and specialist trades.
See full installation cost breakdown for Stroud →Stroud's Five Valleys setting means many homes are built on hillsides, with a mix of former mill workers' cottages, Victorian terraces, and eco-builds.
Hillside properties in Stroud can have complex drainage due to the gradient, sometimes requiring pumped systems for uphill bathroom waste.
Nestled in the Five Valleys, Stroud's characterful Cotswold stone homes and hillside properties often need creative bathroom designs that work with older building layouts.
Most listed building installations run 8–12 working days from strip-out to silicone. Older substrates and traditional fittings can add a couple of days — we'll set the schedule before we start so you know what to expect in your Stroud home.
Expect roughly £4,500 at the lower end, £7,800 for a typical mid-range refit, and £14,000+ for a high-spec installation. Listed building bathroom refits commonly run 25–50% above the regional typical due to consents, traditional materials, slower pace, and specialist trades. Stroud prices in line with the wider Gloucestershire market.
Yes. We project-manage the full installation in-house: strip-out, first-fix plumbing and electrics, plastering and substrate prep, tiling, second-fix and finishing. You deal with one team and one quote, not five trades.
All bathroom electrics are notified under Part P. We'll also brief you on anything specific to a listed building in Stroud — soil-stack alterations, listed-building consent, or conservation-area constraints if they apply.
For most listed building homes, the bathroom is fully out of action for 5–7 days mid-project. Where there's a second WC or basin we keep that running; otherwise we agree a plan up front.
Free site survey. Itemised written quote. We'll flag any listed building-specific issues before we ever quote a final number.
Tell us about your project and we'll get back to you within 24 hours.
A small sample of Gloucestershire work. Every job here was managed by the same team that would handle your Stroud project.



Free site visit anywhere in GL5, GL6, GL10. Written quote inside 24 hours. Workmanship guaranteed in writing.
Final thought: a bathroom installation is a 1–3 week project that lives with you for a decade. Choose the team that takes the visit seriously, asks the awkward questions, and writes the price down. We do all three across GL5.
Bathroom Installation jobs in Stroud are scheduled around the realities below — postcode coverage, nearest roads, councils involved, and the named places we travel to from there.
Stroud District Council — covering GL5, GL6, GL10 postcode districts.
We reach Stroud via A46, A419, M5 J13 — and serve sites within roughly 15 miles of here.
Stonehouse Industrial Estate · Bath Road Trading Estate
Stroud's Five Valleys means steep, narrow lanes — for hillside properties we sometimes need to barrow materials from the nearest turning point.