Pre-1840 typically property · Gloucestershire
A full installation done properly for a listed building — strip-out, plumbing, electrics, tiling and finishing handled as one project. Listed buildings — Grade I, II*, and II — are the most heavily regulated property type, and bathroom fitting in them must be planned around consent, breathable materials, and the specific significance of the listing.
A complete bathroom installation in a listed building typically runs through these stages:
Old suite, tiles and substrate removed. Joists, pipework and walls inspected — important in Pre-1840 typically properties where what's behind the tiles isn't always what you'd expect.
Hot/cold supply re-routed where needed, soil and waste set, new electrical circuits run and certified under Part P. Underfloor heating laid if specified.
Tile-backer board on wet walls, plaster on dry. Floor levelled and reinforced where the joists need it — common in older properties.
Wall and floor tiling, suite fitted, second-fix electrics, sealants, decoration and snag-list — everything ready to use the day we hand back.
Specific quirks of listed building properties in Dursley.
Once the old bathroom is out, these are the issues we most often find in listed building homes around Dursley — and we cost them in honestly before re-fitting.
Previous unsympathetic refits (1970s/80s) requiring full reversal
Damp from inappropriate modern repointing trapping moisture
Concealed historic services that mustn't be disturbed without survey
Inadequate insulation balanced against breathability requirements
For a listed building installations specifically — most relevant to Gloucestershire properties.
Variable — often retrofitted into former dressing rooms, closets, or rear additions. Layouts must work around the historic plan, never against it.
~£7,800
Typical installed price in Dursley (£4,500–£14,000 range)
Listed building bathroom refits commonly run 25–50% above the regional typical due to consents, traditional materials, slower pace, and specialist trades.
See full installation cost breakdown for Dursley →Dursley has stone-built terraces from the mill era, inter-war housing, and modern estates expanding towards Cam.
Older stone terraces in Dursley often have limited space for bathrooms, making compact fixture selection and creative layouts essential.
Situated beneath the Cotswold escarpment, Dursley's residential properties range from stone terraces to modern estates, all benefiting from expert bathroom fitting services.
Most listed building installations run 8–12 working days from strip-out to silicone. Older substrates and traditional fittings can add a couple of days — we'll set the schedule before we start so you know what to expect in your Dursley home.
Expect roughly £4,500 at the lower end, £7,800 for a typical mid-range refit, and £14,000+ for a high-spec installation. Listed building bathroom refits commonly run 25–50% above the regional typical due to consents, traditional materials, slower pace, and specialist trades. Dursley prices in line with the wider Gloucestershire market.
Yes. We project-manage the full installation in-house: strip-out, first-fix plumbing and electrics, plastering and substrate prep, tiling, second-fix and finishing. You deal with one team and one quote, not five trades.
All bathroom electrics are notified under Part P. We'll also brief you on anything specific to a listed building in Dursley — soil-stack alterations, listed-building consent, or conservation-area constraints if they apply.
For most listed building homes, the bathroom is fully out of action for 5–7 days mid-project. Where there's a second WC or basin we keep that running; otherwise we agree a plan up front.
Free site survey. Itemised written quote. We'll flag any listed building-specific issues before we ever quote a final number.
Tell us about your project and we'll get back to you within 24 hours.
Nothing AI-rendered, nothing stock — these are jobs we've delivered in and around Gloucestershire.



Five-minute call, honest opinion on what's involved, no pressure. If it's not the right fit we'll tell you.
Final thought: a bathroom installation is a 1–3 week project that lives with you for a decade. Choose the team that takes the visit seriously, asks the awkward questions, and writes the price down. We do all three across GL11.
Bathroom Installation jobs in Dursley are scheduled around the realities below — postcode coverage, nearest roads, councils involved, and the named places we travel to from there.
Stroud District Council — covering GL11 postcode district.
We reach Dursley via A38, M5 J14 — and serve sites within roughly 14 miles of here.
Draycott Business Park · Castle Street trading area
Dursley sits beneath Stinchcombe Hill — hillside lanes mean we plan deliveries for off-peak so as not to block residents.