1901–1918 property · Gloucestershire
A full installation done properly for an Edwardian semi — strip-out, plumbing, electrics, tiling and finishing handled as one project. Edwardian semis are the friendlier cousin of the Victorian terrace — wider plots, slightly more generous proportions, and bathrooms that often sit on the first floor over the hallway or a downstairs WC. Brick is generally better-quality and walls a touch more forgiving for tiling.
A complete bathroom installation in a edwardian semi typically runs through these stages:
Old suite, tiles and substrate removed. Joists, pipework and walls inspected — important in 1901–1918 properties where what's behind the tiles isn't always what you'd expect.
Hot/cold supply re-routed where needed, soil and waste set, new electrical circuits run and certified under Part P. Underfloor heating laid if specified.
Tile-backer board on wet walls, plaster on dry. Floor levelled and reinforced where the joists need it — common in older properties.
Wall and floor tiling, suite fitted, second-fix electrics, sealants, decoration and snag-list — everything ready to use the day we hand back.
Specific quirks of edwardian semi properties in Stroud.
Once the old bathroom is out, these are the issues we most often find in edwardian semi homes around Stroud — and we cost them in honestly before re-fitting.
Hot water pressure issues on upper floors with original gravity systems
Cold drafts from suspended timber ground floors below
Failed pointing on external chimney breasts that pass through the bathroom
Dated colour suites (avocado, salmon) needing total replacement
For an Edwardian semi installations specifically — most relevant to Gloucestershire properties.
Around 2.4×2.0m first-floor bathroom over the hallway, with bath under the window, basin pedestal, and standard close-coupled WC on an internal wall.
~£7,800
Typical installed price in Stroud (£4,500–£14,000 range)
Edwardian semi bathroom refits generally fall in the regional typical range — plumbing access is good and ceilings give plenty of working height.
See full installation cost breakdown for Stroud →Stroud's Five Valleys setting means many homes are built on hillsides, with a mix of former mill workers' cottages, Victorian terraces, and eco-builds.
Hillside properties in Stroud can have complex drainage due to the gradient, sometimes requiring pumped systems for uphill bathroom waste.
Nestled in the Five Valleys, Stroud's characterful Cotswold stone homes and hillside properties often need creative bathroom designs that work with older building layouts.
Most edwardian semi installations run 8–12 working days from strip-out to silicone. Older substrates and traditional fittings can add a couple of days — we'll set the schedule before we start so you know what to expect in your Stroud home.
Expect roughly £4,500 at the lower end, £7,800 for a typical mid-range refit, and £14,000+ for a high-spec installation. Edwardian semi bathroom refits generally fall in the regional typical range — plumbing access is good and ceilings give plenty of working height. Stroud prices in line with the wider Gloucestershire market.
Yes. We project-manage the full installation in-house: strip-out, first-fix plumbing and electrics, plastering and substrate prep, tiling, second-fix and finishing. You deal with one team and one quote, not five trades.
All bathroom electrics are notified under Part P. We'll also brief you on anything specific to an Edwardian semi in Stroud — soil-stack alterations, listed-building consent, or conservation-area constraints if they apply.
For most edwardian semi homes, the bathroom is fully out of action for 5–7 days mid-project. Where there's a second WC or basin we keep that running; otherwise we agree a plan up front.
Free site survey. Itemised written quote. We'll flag any edwardian semi-specific issues before we ever quote a final number.
Tell us about your project and we'll get back to you within 24 hours.
A small sample of Gloucestershire work. Every job here was managed by the same team that would handle your Stroud project.



Once the spec is agreed, the price is the price. We don't bill for "unforeseen extras" unless something genuinely unforeseen is uncovered, and we always ask first.
Most Stroud clients come to us after a quote elsewhere that felt thin on detail. Ours isn't — every line item is listed, every assumption is named, and we'd rather lose the job than over-promise.
Bathroom Installation jobs in Stroud are scheduled around the realities below — postcode coverage, nearest roads, councils involved, and the named places we travel to from there.
Stroud District Council — covering GL5, GL6, GL10 postcode districts.
We reach Stroud via A46, A419, M5 J13 — and serve sites within roughly 15 miles of here.
Stonehouse Industrial Estate · Bath Road Trading Estate
Stroud's Five Valleys means steep, narrow lanes — for hillside properties we sometimes need to barrow materials from the nearest turning point.