Pre-1840 typically property · Gloucestershire
A full installation done properly for a listed building — strip-out, plumbing, electrics, tiling and finishing handled as one project. Listed buildings — Grade I, II*, and II — are the most heavily regulated property type, and bathroom fitting in them must be planned around consent, breathable materials, and the specific significance of the listing.
A complete bathroom installation in a listed building typically runs through these stages:
Old suite, tiles and substrate removed. Joists, pipework and walls inspected — important in Pre-1840 typically properties where what's behind the tiles isn't always what you'd expect.
Hot/cold supply re-routed where needed, soil and waste set, new electrical circuits run and certified under Part P. Underfloor heating laid if specified.
Tile-backer board on wet walls, plaster on dry. Floor levelled and reinforced where the joists need it — common in older properties.
Wall and floor tiling, suite fitted, second-fix electrics, sealants, decoration and snag-list — everything ready to use the day we hand back.
Specific quirks of listed building properties in Drybrook.
Once the old bathroom is out, these are the issues we most often find in listed building homes around Drybrook — and we cost them in honestly before re-fitting.
Previous unsympathetic refits (1970s/80s) requiring full reversal
Damp from inappropriate modern repointing trapping moisture
Concealed historic services that mustn't be disturbed without survey
Inadequate insulation balanced against breathability requirements
For a listed building installations specifically — most relevant to Gloucestershire properties.
Variable — often retrofitted into former dressing rooms, closets, or rear additions. Layouts must work around the historic plan, never against it.
~£7,650
Typical installed price in Drybrook (£4,400–£13,700 range)
Listed building bathroom refits commonly run 25–50% above the regional typical due to consents, traditional materials, slower pace, and specialist trades.
See full installation cost breakdown for Drybrook →Drybrook has a linear village layout with Victorian miners' houses, 1950s council housing, and modern infill.
Former mining settlement Drybrook may have ground instability issues that should be checked before heavy bathroom installations.
A Forest of Dean community with good road links, Drybrook's accessible location makes it easy to serve with professional bathroom services.
Most listed building installations run 8–12 working days from strip-out to silicone. Older substrates and traditional fittings can add a couple of days — we'll set the schedule before we start so you know what to expect in your Drybrook home.
Expect roughly £4,400 at the lower end, £7,650 for a typical mid-range refit, and £13,700+ for a high-spec installation. Listed building bathroom refits commonly run 25–50% above the regional typical due to consents, traditional materials, slower pace, and specialist trades. Drybrook jobs tend to come in fractionally below the regional average when scheduled alongside other work in the same postcode.
Yes. We project-manage the full installation in-house: strip-out, first-fix plumbing and electrics, plastering and substrate prep, tiling, second-fix and finishing. You deal with one team and one quote, not five trades.
All bathroom electrics are notified under Part P. We'll also brief you on anything specific to a listed building in Drybrook — soil-stack alterations, listed-building consent, or conservation-area constraints if they apply.
For most listed building homes, the bathroom is fully out of action for 5–7 days mid-project. Where there's a second WC or basin we keep that running; otherwise we agree a plan up front.
Free site survey. Itemised written quote. We'll flag any listed building-specific issues before we ever quote a final number.
Tell us about your project and we'll get back to you within 24 hours.
Real photos from completed jobs near Drybrook — the closest geographically and in property type to what we'd quote for you.



Once the spec is agreed, the price is the price. We don't bill for "unforeseen extras" unless something genuinely unforeseen is uncovered, and we always ask first.
Bottom line for GL (Gloucestershire): bathroom installation done by a local team that you can actually phone back. Same person quotes, fits, and handles snags. Quote in writing inside 24 hours.
Bathroom Installation jobs in Drybrook are scheduled around the realities below — postcode coverage, nearest roads, councils involved, and the named places we travel to from there.
Gloucestershire County Council — covering GL postcode district.
We reach Drybrook via M5, A40, A417 — and serve sites within roughly 25 miles of here.
Quedgeley West Business Park · Kingsditch Trading Estate
Most of the county is reachable inside an hour from our Gloucester base via the M5 and A40.