1901–1918 property · Gloucestershire
A full installation done properly for an Edwardian semi — strip-out, plumbing, electrics, tiling and finishing handled as one project. Edwardian semis are the friendlier cousin of the Victorian terrace — wider plots, slightly more generous proportions, and bathrooms that often sit on the first floor over the hallway or a downstairs WC. Brick is generally better-quality and walls a touch more forgiving for tiling.
A complete bathroom installation in a edwardian semi typically runs through these stages:
Old suite, tiles and substrate removed. Joists, pipework and walls inspected — important in 1901–1918 properties where what's behind the tiles isn't always what you'd expect.
Hot/cold supply re-routed where needed, soil and waste set, new electrical circuits run and certified under Part P. Underfloor heating laid if specified.
Tile-backer board on wet walls, plaster on dry. Floor levelled and reinforced where the joists need it — common in older properties.
Wall and floor tiling, suite fitted, second-fix electrics, sealants, decoration and snag-list — everything ready to use the day we hand back.
Specific quirks of edwardian semi properties in King's Stanley.
Once the old bathroom is out, these are the issues we most often find in edwardian semi homes around King's Stanley — and we cost them in honestly before re-fitting.
Hot water pressure issues on upper floors with original gravity systems
Cold drafts from suspended timber ground floors below
Failed pointing on external chimney breasts that pass through the bathroom
Dated colour suites (avocado, salmon) needing total replacement
For an Edwardian semi installations specifically — most relevant to Gloucestershire properties.
Around 2.4×2.0m first-floor bathroom over the hallway, with bath under the window, basin pedestal, and standard close-coupled WC on an internal wall.
~£7,650
Typical installed price in King's Stanley (£4,400–£13,700 range)
Edwardian semi bathroom refits generally fall in the regional typical range — plumbing access is good and ceilings give plenty of working height.
See full installation cost breakdown for King's Stanley →King's Stanley sits at the foot of the Cotswold escarpment with former mill workers' cottages and modern village housing.
King's Stanley mill cottages often have very compact bathrooms in lean-to extensions with limited headroom that require creative fixture placement.
Adjoining Leonard Stanley near Stonehouse, King's Stanley's village properties are perfect for thoughtful bathroom renovations and plumbing upgrades.
Most edwardian semi installations run 8–12 working days from strip-out to silicone. Older substrates and traditional fittings can add a couple of days — we'll set the schedule before we start so you know what to expect in your King's Stanley home.
Expect roughly £4,400 at the lower end, £7,650 for a typical mid-range refit, and £13,700+ for a high-spec installation. Edwardian semi bathroom refits generally fall in the regional typical range — plumbing access is good and ceilings give plenty of working height. King's Stanley jobs tend to come in fractionally below the regional average when scheduled alongside other work in the same postcode.
Yes. We project-manage the full installation in-house: strip-out, first-fix plumbing and electrics, plastering and substrate prep, tiling, second-fix and finishing. You deal with one team and one quote, not five trades.
All bathroom electrics are notified under Part P. We'll also brief you on anything specific to an Edwardian semi in King's Stanley — soil-stack alterations, listed-building consent, or conservation-area constraints if they apply.
For most edwardian semi homes, the bathroom is fully out of action for 5–7 days mid-project. Where there's a second WC or basin we keep that running; otherwise we agree a plan up front.
Free site survey. Itemised written quote. We'll flag any edwardian semi-specific issues before we ever quote a final number.
Tell us about your project and we'll get back to you within 24 hours.
A small sample of Gloucestershire work. Every job here was managed by the same team that would handle your King's Stanley project.



Tell us the postcode (King's Stanley and within 12 miles) and we'll come round, scope the job, and follow up with a fixed-price written quote inside 24 hours.
Final thought: a bathroom installation is a 1–3 week project that lives with you for a decade. Choose the team that takes the visit seriously, asks the awkward questions, and writes the price down. We do all three across GL10.
Bathroom Installation jobs in King's Stanley are scheduled around the realities below — postcode coverage, nearest roads, councils involved, and the named places we travel to from there.
Stroud District Council — covering GL10 postcode district.
We reach King's Stanley via A419, M5 J13 — and serve sites within roughly 12 miles of here.
Stonehouse Industrial Estate · Oldends Lane Industrial Estate
King's Stanley is a Stonehouse neighbourhood — stonehouse benefits from m5 j13 access — material lead times are short and same-week starts are usually possible.