1920s–present property · Gloucestershire
A full installation done properly for a bungalow — strip-out, plumbing, electrics, tiling and finishing handled as one project. Bungalow bathrooms are well-suited to wet-rooms and accessible refits — single-floor living means no joist concerns from above and all drainage is at ground level. The challenge is usually older fittings, smaller rooms, and an owner profile thinking about long-term accessibility.
A complete bathroom installation in a bungalow typically runs through these stages:
Old suite, tiles and substrate removed. Joists, pipework and walls inspected — important in 1920s–present properties where what's behind the tiles isn't always what you'd expect.
Hot/cold supply re-routed where needed, soil and waste set, new electrical circuits run and certified under Part P. Underfloor heating laid if specified.
Tile-backer board on wet walls, plaster on dry. Floor levelled and reinforced where the joists need it — common in older properties.
Wall and floor tiling, suite fitted, second-fix electrics, sealants, decoration and snag-list — everything ready to use the day we hand back.
Specific quirks of bungalow properties in King's Stanley.
Once the old bathroom is out, these are the issues we most often find in bungalow homes around King's Stanley — and we cost them in honestly before re-fitting.
Outdated avocado/salmon suites still surprisingly common
Inaccessible WC heights for older homeowners
Slippery vinyl floors past their lifespan
Single thermostatic shower over the bath with no enclosure
For a bungalow installations specifically — most relevant to Gloucestershire properties.
Around 2.3×2.0m bathroom on the bungalow's external wall, often back-to-back with the kitchen for shared service runs.
~£7,650
Typical installed price in King's Stanley (£4,400–£13,700 range)
Bungalow refits run close to the regional average for standard refits, and slightly above for accessibility conversions due to grab rails, level-access trays, and wider doorways.
See full installation cost breakdown for King's Stanley →King's Stanley sits at the foot of the Cotswold escarpment with former mill workers' cottages and modern village housing.
King's Stanley mill cottages often have very compact bathrooms in lean-to extensions with limited headroom that require creative fixture placement.
Adjoining Leonard Stanley near Stonehouse, King's Stanley's village properties are perfect for thoughtful bathroom renovations and plumbing upgrades.
Most bungalow installations run 8–12 working days from strip-out to silicone. Older substrates and traditional fittings can add a couple of days — we'll set the schedule before we start so you know what to expect in your King's Stanley home.
Expect roughly £4,400 at the lower end, £7,650 for a typical mid-range refit, and £13,700+ for a high-spec installation. Bungalow refits run close to the regional average for standard refits, and slightly above for accessibility conversions due to grab rails, level-access trays, and wider doorways. King's Stanley jobs tend to come in fractionally below the regional average when scheduled alongside other work in the same postcode.
Yes. We project-manage the full installation in-house: strip-out, first-fix plumbing and electrics, plastering and substrate prep, tiling, second-fix and finishing. You deal with one team and one quote, not five trades.
All bathroom electrics are notified under Part P. We'll also brief you on anything specific to a bungalow in King's Stanley — soil-stack alterations, listed-building consent, or conservation-area constraints if they apply.
For most bungalow homes, the bathroom is fully out of action for 5–7 days mid-project. Where there's a second WC or basin we keep that running; otherwise we agree a plan up front.
Free site survey. Itemised written quote. We'll flag any bungalow-specific issues before we ever quote a final number.
Tell us about your project and we'll get back to you within 24 hours.
A small sample of Gloucestershire work. Every job here was managed by the same team that would handle your King's Stanley project.



Free site visit anywhere in near A419. Written quote inside 24 hours. Workmanship guaranteed in writing.
Summary: a single Gloucestershire-based team, one written quote, every trade in-house — that's what makes a bathroom installation in King's Stanley run on time. If you want a slow, careful job rather than the fastest, we're the right call.
Bathroom Installation jobs in King's Stanley are scheduled around the realities below — postcode coverage, nearest roads, councils involved, and the named places we travel to from there.
Stroud District Council — covering GL10 postcode district.
We reach King's Stanley via A419, M5 J13 — and serve sites within roughly 12 miles of here.
Stonehouse Industrial Estate · Oldends Lane Industrial Estate
King's Stanley is a Stonehouse neighbourhood — stonehouse benefits from m5 j13 access — material lead times are short and same-week starts are usually possible.