1901–1918 property · Gloucestershire
A full installation done properly for an Edwardian semi — strip-out, plumbing, electrics, tiling and finishing handled as one project. Edwardian semis are the friendlier cousin of the Victorian terrace — wider plots, slightly more generous proportions, and bathrooms that often sit on the first floor over the hallway or a downstairs WC. Brick is generally better-quality and walls a touch more forgiving for tiling.
A complete bathroom installation in a edwardian semi typically runs through these stages:
Old suite, tiles and substrate removed. Joists, pipework and walls inspected — important in 1901–1918 properties where what's behind the tiles isn't always what you'd expect.
Hot/cold supply re-routed where needed, soil and waste set, new electrical circuits run and certified under Part P. Underfloor heating laid if specified.
Tile-backer board on wet walls, plaster on dry. Floor levelled and reinforced where the joists need it — common in older properties.
Wall and floor tiling, suite fitted, second-fix electrics, sealants, decoration and snag-list — everything ready to use the day we hand back.
Specific quirks of edwardian semi properties in Blockley.
Once the old bathroom is out, these are the issues we most often find in edwardian semi homes around Blockley — and we cost them in honestly before re-fitting.
Hot water pressure issues on upper floors with original gravity systems
Cold drafts from suspended timber ground floors below
Failed pointing on external chimney breasts that pass through the bathroom
Dated colour suites (avocado, salmon) needing total replacement
For an Edwardian semi installations specifically — most relevant to Gloucestershire properties.
Around 2.4×2.0m first-floor bathroom over the hallway, with bath under the window, basin pedestal, and standard close-coupled WC on an internal wall.
~£8,750
Typical installed price in Blockley (£5,050–£15,700 range)
Edwardian semi bathroom refits generally fall in the regional typical range — plumbing access is good and ceilings give plenty of working height.
See full installation cost breakdown for Blockley →Blockley features former silk workers' cottages, Georgian millowners' houses, and converted mill buildings along the brook.
Many Blockley properties are Grade II listed, requiring listed building consent for bathroom alterations that affect the building's character.
A former silk-mill village in the North Cotswolds, Blockley's historic properties require bathroom fitters who understand listed building constraints.
Most edwardian semi installations run 8–12 working days from strip-out to silicone. Older substrates and traditional fittings can add a couple of days — we'll set the schedule before we start so you know what to expect in your Blockley home.
Expect roughly £5,050 at the lower end, £8,750 for a typical mid-range refit, and £15,700+ for a high-spec installation. Edwardian semi bathroom refits generally fall in the regional typical range — plumbing access is good and ceilings give plenty of working height. Listed-building rules in Blockley typically add 8–14% to a refit job — extra consents, traditional materials, and slower stripping out.
Yes. We project-manage the full installation in-house: strip-out, first-fix plumbing and electrics, plastering and substrate prep, tiling, second-fix and finishing. You deal with one team and one quote, not five trades.
All bathroom electrics are notified under Part P. We'll also brief you on anything specific to an Edwardian semi in Blockley — soil-stack alterations, listed-building consent, or conservation-area constraints if they apply.
For most edwardian semi homes, the bathroom is fully out of action for 5–7 days mid-project. Where there's a second WC or basin we keep that running; otherwise we agree a plan up front.
Free site survey. Itemised written quote. We'll flag any edwardian semi-specific issues before we ever quote a final number.
Tell us about your project and we'll get back to you within 24 hours.
Examples of recent work delivered close to Blockley. We choose projects from the nearest postcode area first so you can see what's been built locally.



5.0 stars across 34 reviews. Local team. Fully insured. Workmanship guarantee. We're 20 minutes from Blockley, so we're not booking and dropping.
Next step: get a written quote. We travel to Blockley (and anywhere within 25 miles of Moreton-in-Marsh) without a callout fee. Bring photos of the room if you have them — it saves a visit.
Bathroom Installation jobs in Blockley are scheduled around the realities below — postcode coverage, nearest roads, councils involved, and the named places we travel to from there.
Gloucestershire County Council — covering GL postcode district.
We reach Blockley via M5, A40, A417 — and serve sites within roughly 25 miles of here.
Quedgeley West Business Park · Kingsditch Trading Estate
Most of the county is reachable inside an hour from our Gloucester base via the M5 and A40.