Expert bathroom wall and floor tiling with proper waterproofing, precise cuts, and professional grouting for a flawless, lasting finish. Serving Blockley and surrounding areas.
Standard grout in a shower area will crack and absorb water. Blockley bathrooms need flexible, waterproof adhesive and epoxy or polymer-modified grout in wet zones. This isn't optional.
Wobbly cuts around pipes, uneven edges at corners, and lippage between tiles — these are the hallmarks of a rushed tiling job. In Blockley bathrooms, you'll notice these every single day.
Don't let these problems get worse. Get your free quote today.
✓
Free Quotes
✓
Fully Insured
✓
Clean & Tidy
✓
Workmanship Guarantee
Tiling transforms a bathroom from a building site into a finished room — and in Blockley, the tiling quality determines whether that transformation impresses or disappoints. We've tiled hundreds of Gloucestershire bathrooms using everything from budget ceramics to premium porcelain and natural stone, and the standard of preparation and execution never varies.
Our tiling process in Blockley starts well before the first tile is placed. We check every wall for plumb, every floor for level, and every surface for adequate adhesion. If a wall is out by more than 3mm in 2 metres, we correct it first. If a floor dips, we self-level. This preparation is invisible in the finished room — but it's what makes the tiles look perfect.
A former silk-mill village in the North Cotswolds, Blockley's historic properties require bathroom fitters who understand listed building constraints.
Blockley features former silk workers' cottages, Georgian millowners' houses, and converted mill buildings along the brook.
Many Blockley properties are Grade II listed, requiring listed building consent for bathroom alterations that affect the building's character.
water is moderately hard in most of Gloucestershire (150-250 mg/l calcium carbonate). Limescale builds up on shower heads, taps, and heating elements — thermostatic valves and easy-clean coated shower glass help manage this. many older Gloucestershire homes have solid stone or brick walls (no cavity), which means fixing bathroom fittings requires different techniques — heavy-duty masonry anchors and careful drilling to avoid cracking stone.
Grout choice in Blockley bathrooms is more important than most people realise. Standard cement grout in shower areas will discolour and crack within 2-3 years. We use epoxy grout in wet zones — it's waterproof, stain-resistant, and doesn't crack. It costs more but lasts indefinitely, saving you from re-grouting.
Natural stone tiles in Gloucestershire bathrooms need different treatment from ceramic or porcelain. In Blockley installations, we seal natural stone before grouting (to prevent grout staining the stone face), use colour-matched flexible adhesive, and advise homeowners on ongoing maintenance. The extra preparation is essential with premium materials.
If you're tiling over existing tiles in your Blockley bathroom (which can work if they're firmly bonded), use a contact primer first. This gives the new adhesive something to grip — smooth glazed surfaces won't bond reliably without it.
In Gloucestershire bathrooms with underfloor heating, tiles need flexible adhesive that accommodates thermal expansion. Standard rigid adhesive on a heated floor will crack within the first winter. Specify flexible adhesive from the start.
Buy 10% more tiles than the calculated area for your Blockley bathroom — cuts, breakages, and pattern matching all use extra tiles. Running out mid-job and finding the batch has changed colour is a common and frustrating problem.
Bathroom Tiling jobs in Blockley are scheduled around the realities below — postcode coverage, nearest roads, councils involved, and the named places we travel to from there.
Gloucestershire County Council — covering GL postcode district.
We reach Blockley via M5, A40, A417 — and serve sites within roughly 25 miles of here.
Quedgeley West Business Park · Kingsditch Trading Estate
Most of the county is reachable inside an hour from our Gloucester base via the M5 and A40.
A small sample of Gloucestershire work. Every job here was managed by the same team that would handle your Blockley project.



We understand that inviting tradespeople into your Blockley home requires trust. That's why we're transparent about every aspect of bathroom tiling: who will be in your home, what they'll be doing each day, how we handle unexpected discoveries, and exactly what the finished project will look like.
Our bathroom tiling projects in Gloucestershire include a formal snagging process. Before your final payment, we do a walk-through inspection of every element in your Blockley property. Any items that aren't perfect — a silicone line that needs redoing, a fitting that needs tightening — get addressed before we consider the project complete.
Using the wrong adhesive. Flexible adhesive is essential on heated floors, waterproof adhesive in wet areas, and rapid-set in high-traffic zones. Using the same adhesive everywhere across Gloucestershire is a recipe for failure.
Ignoring expansion joints. Continuous tiled areas over 6m in Gloucestershire properties need expansion joints to prevent cracking. In Blockley bathrooms, the junction between walls and floor also needs a flexible joint.
Grouting too soon after tiling. Adhesive needs to cure properly before grouting — typically 24 hours. Grouting too early in Blockley installations can shift tiles and compromise the waterproof bond.
What makes bathroom tiling in Blockley different from other areas of Gloucestershire is the unique mix of property ages and construction methods we encounter. We carry a comprehensive stock of parts and materials on our vehicles, which means most bathroom tiling work in Blockley can proceed without delays waiting for specialist supplies. We guarantee our bathroom tiling workmanship across Gloucestershire. If anything we've installed develops a fault within the guarantee period, we return to Blockley and put it right at no cost. Blockley is one of our core service areas across Gloucestershire. We know the local suppliers, understand the building styles, and have the experience to deliver bathroom tiling that genuinely lasts.
We approach every bathroom tiling project in Blockley as if it were our own home — because our reputation depends on every single job we complete. In Blockley, we've learned that thorough preparation accounts for 40% of a successful bathroom tiling project — it's the work you don't see that determines how long the result lasts. After completing bathroom tiling in Blockley, we provide a handover that includes care instructions, warranty information, and emergency contact details — because looking after your investment matters. If you're considering bathroom tiling in Blockley, we'd welcome the opportunity to visit, assess your property, and provide an honest, detailed quote with no obligation.
A Gloucestershire-based team doing bathroom tiling in Blockley has something national contractors don't: accountability. We live and work in this area. Our children go to local schools. Our reputation in Blockley is built on every project we complete — which means we can't afford to do anything less than our best work.
Remove old tiles, repair plaster, check for damp, apply waterproof membrane to wet areas.
Plan the tile layout for symmetry, ensuring cuts are balanced and positioned in the least visible places.
Tiles laid with consistent spacers, level checks, and precision cuts using a wet tile cutter.
Waterproof grout applied, excess cleaned, silicone sealed at all junctions between different materials.
To discuss your bathroom tiling project in Blockley, call us on 07927 593585 or request a free quote.
Sometimes — if the existing tiles are sound, flat, and firmly adhered. But in wet areas of Blockley bathrooms, we usually recommend removing them to check for damp and apply proper waterproofing.
Large tiles need a perfectly flat substrate — any undulation and they'll rock. We use self-levelling compound on floors and render or backer board on walls. Precision cuts with a wet cutter, not angle grinder.
Tiles and underfloor heating are a perfect combination. We install electric mat systems before tiling — it adds about a day to the project and costs from £300 for a bathroom.
Tell us about your project and we'll get back to you within 24 hours.
We also offer these services in Blockley and surrounding areas.
We also provide bathroom tiling in these nearby areas:
Hand-written background reading and pricing for this exact combination — not auto-generated filler.
Contact Cotswold Maintenance Group today for a free, no-obligation quote. We'll get back to you within 24 hours.
Once the spec is agreed, the price is the price. We don't bill for "unforeseen extras" unless something genuinely unforeseen is uncovered, and we always ask first.
If you've read this far, you probably want a quote rather than more marketing. Send your address and rough scope — we drive over from Gloucestershire via M5, look at the room, and price it line by line.