Post-2000 property · Gloucestershire
A full installation done properly for a new-build home — strip-out, plumbing, electrics, tiling and finishing handled as one project. New-build bathrooms (10–25 years old) often need refitting earlier than expected. Developer-spec suites, basic tile schemes, and underwhelming brassware combine with a layout that's predictable and a substrate that's actually pretty straightforward to work with.
A complete bathroom installation in a new-build typically runs through these stages:
Old suite, tiles and substrate removed. Joists, pipework and walls inspected — important in Post-2000 properties where what's behind the tiles isn't always what you'd expect.
Hot/cold supply re-routed where needed, soil and waste set, new electrical circuits run and certified under Part P. Underfloor heating laid if specified.
Tile-backer board on wet walls, plaster on dry. Floor levelled and reinforced where the joists need it — common in older properties.
Wall and floor tiling, suite fitted, second-fix electrics, sealants, decoration and snag-list — everything ready to use the day we hand back.
Specific quirks of new-build properties in Leonard Stanley.
Once the old bathroom is out, these are the issues we most often find in new-build homes around Leonard Stanley — and we cost them in honestly before re-fitting.
Mass-spec showers and valves failing within 5–8 years
Small-format tiles tired-looking but adhesive still strong (substrate often reusable)
Extractors undersized for actual usage patterns
Builder-grade chrome pitting in hard-water areas
For a new-build home installations specifically — most relevant to Gloucestershire properties.
Family bathroom typically 2.2×1.9m with shower-bath, vanity basin, close-coupled WC; en-suite typically 1.8×1.6m with quadrant or rectangular shower, basin, WC.
~£7,650
Typical installed price in Leonard Stanley (£4,400–£13,700 range)
New-build bathroom refits sit slightly below the regional average — clean substrates, fewer surprises, faster turnaround.
See full installation cost breakdown for Leonard Stanley →Leonard Stanley is a village near Stonehouse with Cotswold stone properties, a Norman priory church, and modern residential areas.
Period properties in Leonard Stanley often have original stone-flagged floors that need careful preparation before bathroom tiling can be laid.
A village south of Stonehouse, Leonard Stanley's attractive Cotswold homes benefit from bathroom installations that complement their stone-built character.
Most new-build installations run 8–12 working days from strip-out to silicone. Older substrates and traditional fittings can add a couple of days — we'll set the schedule before we start so you know what to expect in your Leonard Stanley home.
Expect roughly £4,400 at the lower end, £7,650 for a typical mid-range refit, and £13,700+ for a high-spec installation. New-build bathroom refits sit slightly below the regional average — clean substrates, fewer surprises, faster turnaround. Leonard Stanley jobs tend to come in fractionally below the regional average when scheduled alongside other work in the same postcode.
Yes. We project-manage the full installation in-house: strip-out, first-fix plumbing and electrics, plastering and substrate prep, tiling, second-fix and finishing. You deal with one team and one quote, not five trades.
All bathroom electrics are notified under Part P. We'll also brief you on anything specific to a new-build home in Leonard Stanley — soil-stack alterations, listed-building consent, or conservation-area constraints if they apply.
For most new-build homes, the bathroom is fully out of action for 5–7 days mid-project. Where there's a second WC or basin we keep that running; otherwise we agree a plan up front.
Free site survey. Itemised written quote. We'll flag any new-build-specific issues before we ever quote a final number.
Tell us about your project and we'll get back to you within 24 hours.
Examples of recent work delivered close to Leonard Stanley. We choose projects from the nearest postcode area first so you can see what's been built locally.



Our diary fills 3–4 weeks ahead in peak season. Get on the list now and we'll confirm a site-visit window inside one working day.
If you've read this far, you probably want a quote rather than more marketing. Send your address and rough scope — we drive over from Gloucestershire via A419, look at the room, and price it line by line.
Bathroom Installation jobs in Leonard Stanley are scheduled around the realities below — postcode coverage, nearest roads, councils involved, and the named places we travel to from there.
Stroud District Council — covering GL10 postcode district.
We reach Leonard Stanley via A419, M5 J13 — and serve sites within roughly 12 miles of here.
Stonehouse Industrial Estate · Oldends Lane Industrial Estate
Leonard Stanley is a Stonehouse neighbourhood — stonehouse benefits from m5 j13 access — material lead times are short and same-week starts are usually possible.