16th–19th century property · Gloucestershire
A full installation done properly for a Cotswold cottage — strip-out, plumbing, electrics, tiling and finishing handled as one project. Cotswold cottages — limestone walls, low ceilings, irregular floors, and bathrooms shoehorned into former pantries or upstairs alcoves — are the most characterful and most demanding property type in the region. Almost no two are alike.
A complete bathroom installation in a cotswold cottage typically runs through these stages:
Old suite, tiles and substrate removed. Joists, pipework and walls inspected — important in 16th–19th century properties where what's behind the tiles isn't always what you'd expect.
Hot/cold supply re-routed where needed, soil and waste set, new electrical circuits run and certified under Part P. Underfloor heating laid if specified.
Tile-backer board on wet walls, plaster on dry. Floor levelled and reinforced where the joists need it — common in older properties.
Wall and floor tiling, suite fitted, second-fix electrics, sealants, decoration and snag-list — everything ready to use the day we hand back.
Specific quirks of cotswold cottage properties in Stow-on-the-Wold.
Once the old bathroom is out, these are the issues we most often find in cotswold cottage homes around Stow-on-the-Wold — and we cost them in honestly before re-fitting.
Damp from solid stone walls drawing moisture upward
Wood-wormed timber lintels above bathroom doorways
Single-glazed leaded windows letting heat out and condensation back in
Inadequate hot water from oil-fired or LPG systems serving an updated bathroom
For a Cotswold cottage installations specifically — most relevant to Gloucestershire properties.
Highly variable — often 1.8×1.6m former pantry conversions with hand-cut tiles, or upper-floor rooms with sloping ceilings constraining shower placement.
~£8,750
Typical installed price in Stow-on-the-Wold (£5,050–£15,700 range)
Cotswold cottage bathroom refits typically run 20–40% above the regional average. Slower work, more bespoke fabrication, and consent costs all add up.
See full installation cost breakdown for Stow-on-the-Wold →Most cotswold cottage installations run 8–12 working days from strip-out to silicone. Older substrates and traditional fittings can add a couple of days — we'll set the schedule before we start so you know what to expect in your Stow-on-the-Wold home.
Expect roughly £5,050 at the lower end, £8,750 for a typical mid-range refit, and £15,700+ for a high-spec installation. Cotswold cottage bathroom refits typically run 20–40% above the regional average. Slower work, more bespoke fabrication, and consent costs all add up. Listed-building rules in Stow-on-the-Wold typically add 8–14% to a refit job — extra consents, traditional materials, and slower stripping out.
Yes. We project-manage the full installation in-house: strip-out, first-fix plumbing and electrics, plastering and substrate prep, tiling, second-fix and finishing. You deal with one team and one quote, not five trades.
All bathroom electrics are notified under Part P. We'll also brief you on anything specific to a Cotswold cottage in Stow-on-the-Wold — soil-stack alterations, listed-building consent, or conservation-area constraints if they apply.
For most cotswold cottage homes, the bathroom is fully out of action for 5–7 days mid-project. Where there's a second WC or basin we keep that running; otherwise we agree a plan up front.
Free site survey. Itemised written quote. We'll flag any cotswold cottage-specific issues before we ever quote a final number.
Tell us about your project and we'll get back to you within 24 hours.
Examples of recent work delivered close to Stow-on-the-Wold. We choose projects from the nearest postcode area first so you can see what's been built locally.



Tell us the postcode (near A417) and we'll come round, scope the job, and follow up with a fixed-price written quote inside 24 hours.
If you're weighing up bathroom installation in the GL7 postcode area, the short version is: we cover Stow-on-the-Wold from a base reachable in minutes via A417, we quote in writing, and we don't subcontract the trades. Send the postcode and we'll handle the rest.
Bathroom Installation jobs in Stow-on-the-Wold are scheduled around the realities below — postcode coverage, nearest roads, councils involved, and the named places we travel to from there.
Cotswold District Council — covering GL7 postcode district.
We reach Stow-on-the-Wold via A417, A419, A429 — and serve sites within roughly 20 miles of here.
Love Lane Industrial Estate · Cirencester Business Park
Stow-on-the-Wold is a Cirencester neighbourhood — cirencester town centre is conservation-area controlled — we coordinate skip and material drops with the council where required.